Designed using CAD (Chief Architect Software)

Outline of two hands shaking, with one hand wearing a suit cuff, symbolizing agreement or partnership.

Phase 1
Initial Consultation

  • Meet with a perspective client

  • Gain an understanding of the desired project

  • Record needed measurements

  • Take pictures of the existing structure

  • Based on past projects offer a ballpark estimate


Conclusion: Determine intended scope of work and commit to a preliminary design.

Line drawing of a computer monitor with a 3D cube and arrow icons indicating manipulation, and a cursor arrow pointing at the screen.

Phase 2
Create Schematic Design

  • Collect accurate measurements of existing house

  • Create 3D model based on collected ​measurements​ using Chief Architect design software

  • Update 3D model with proposed changes

  • In-home presentation of proposed renovation 

  • Organize subcontractor site visit for design and budget verification

  • Conduct structural verification study


Conclusion: Establish final design concept and sign construction agreement.

Stamp with 'Authorized' on a document.

Phase 3
Permit Drawings

  • Prepare construction documents

  • Collect structural engineer's recommendation

  • Submit drawings for County approval

  • Pre-construction meeting  

  • Order all necessary materials
    ​

Conclusion: Obtain permits and begin construction.

Icon of a house with a hammer above it, indicating construction or home repair.

Phase 4
Construction & Completion 

  • Supervision of work

  • Schedule and pass all inspections needed

  • Final walk-through 

  • Complete punch list


Conclusion: Finalize work as planned. Take pictures of completed projects and collect customer reviews.

Contact Us
Back to the home page